A successful first call has taken place at quay 1. The tanker LATANA from Bergen has was the first to dock at de newly renovated quay.
After the new container terminal was inaugurated in May 2022, the renovation of quay 1 has been one of Port of Gävle’s bigger projects. Quay 1 is located in the south-west part of the port area and is Port of Gävle’s smaller quay for liquid bulk. Quay 1 was built in the 1930’s and has since then undergone several renovations and improvements.
Since March 2022 quay 1 has been upgraded with fire protection in accordance with ISGOTT. Goods will be handled more securely thanks to that the quay is equipped with marine loading arms. The quay is now dimensioned for vessels with a dead weight (DWT) of 40 000.